References

We are at work for you worldwide. Our customers trust in our many years of experience and distinctive competence. Here we present our installed reference plants.

Largest
Floating Project
in Europe

Text about Health & Safety iconsetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est.

  • All modules and inverters are accessible via safe maintenance gangways
  • Gangways are following the strings, which simplifies maintenance and repair
  • Railings inverter row available on request
  • In final state all cables are protected from long term water contact and direct sunlight

Largest project in the company’s history Diego de Almagro – Chile

With a total capacity of 233 MWp, this bifacial optimised PV tracker project in the Atacama Desert in Chile is the largest project in the company’s history.

This plant produces enough electricity to supply around 55,000 Chilean households with electricity. The total construction time was just under 11 months, and after 6 months the first trackers were already in operation. Covering an area of more than 330 hectares, 5,849 trackers were installed – equipped with 470,205 modules and 46 WTC (Wireless tracker controller). Cleaning of the modules is possible during the night, as the modules can be placed in the cleaning position using the ZIM Track battery Add-On. At the time of completion, this PV tracker project was the largest PV project in Chile.

Colomera – Spain31,158 modules
17 MWp
508 trackers
Start of construction: 2023

Picon – Spain91,674 modules
50 MWp
1,268 trackers
Start of construction: 2022

Poblete – Spain37,402 modules
20 MWp
529 trackers
Start of construction: 2022

Grabik – Poland64,260 modules
35,022 MWp
924 trackers
Start of construction: 2022

Fos-Sur-Mer – France78,364 modules
34 MWp
1,145 trackers
Start of construction: 2021

Lottorf – Germany23,184 modules
10 MWp
276 trackers
Start of construction: 2021

Diego de Almagro – Chile442,179 modules
233 MWp
5,849 trackers
Start of construction: 2021

Tordesillas – BayWa r.e. – Spain71,656 modules
30 MWp
997 trackers
Start of construction: 2020

Granny Smith – Australia23,040 modules
8 MWp
288 trackers
Start of construction: 2019

Don Rodrigo 2 – Spain134,400 modules
51 MWp
1,600 trackers
Start of construction: 2019